Industrial & SteelIn-ProgressGazipur Industrial Zone
Apex Garment Industrial Factory
A heavy-duty 6-story export garment manufacturing facility in Gazipur Industrial Zone. Engineered for high machine floor vibration, ACCORD/RSC compliant fire hydrants, and steel roof truss systems.
Number of Floors6 Floors Height
Total Built Area240,000 sq ft
Client OrganisationApex Textiles Group
Completion / Status2025 (Ongoing)
Industrial & SteelIn-Progress
Gazipur Industrial Zone
Apex Garment Industrial Factory
// PROJECT HIGHLIGHTS
Key Engineering & Architectural Features
Heavy Machine Floor Load Capacity Design (1.5 Ton/sq.m)
ACCORD & Alliance Standard Fire Hydrant & Alarm System
Pre-Engineered Steel Shed Roof with Skylight
ETP Plant Soil & Foundation Civil Works
// STRUCTURAL BENCHMARKS
Technical Parameters & Material Specs
Floor Loading15 kN/m² Heavy Industrial Live Load
Fire StandardNFPA 13, 14 & RSC Fire Norms
Steel Roof Span45-Meter Clear Columnless Span
// PROJECT MILESTONES
Project Execution Timeline
1
Soil Testing & Factory Masterplan
2
Heavy Foundation & Civil Structure
3
Steel Truss Erection & Roof Sheeting
4
Fire Hydrant, Sprinklers & MEP Grid
5
Final Inspection & Buyer Audit Signoff
DEPLOYED SERVICE
View Service SpecsElectrical, Mechanical & Plumbing (MEP)
Single Line Diagram (SLD), HVAC system planning, water supply distribution, and lightning protection.